Verified Commit fb7eef01 by meskio

[feat] extend the expiration of private keys if needed

Check on every fetch of the private key if the expiration is less than
two months before it expire. And extend the expiration if needed.

- Resolves: #8217
parent f6c71494
Pipeline #7070 failed with stages
in 96 minutes 34 seconds